Lectdan
On this page, you find all documents, package deals, and flashcards offered by seller LectDan.
- 6541
- 0
- 190
Community
- Followers
- Following
26 Reviews received
6728 items
Recommended Practice for Basic Inspection-New Pipeline Construction API 1169
Recommended Practice for Basic Inspection-New Pipeline Construction API 1169 
API Specification 5L 
Specification for Line Pipe 
 
 
API Recommended Practice 5L1 
Recommended Practice for Railroad Transportation of Line Pipe 
 
 
API Recommended Practice 5LT 
Recommended Practice for Truck Transportation of Line Pipe 
 
 
API Recommended Practice 5LW 
Recommended Practice for Transportation of Line Pipe on Barges and Marine Vessels 
 
 
API Specification 6D 
Specification for Pipe Valves 
 
 
AP...
- Exam (elaborations)
- • 7 pages •
Recommended Practice for Basic Inspection-New Pipeline Construction API 1169 
API Specification 5L 
Specification for Line Pipe 
 
 
API Recommended Practice 5L1 
Recommended Practice for Railroad Transportation of Line Pipe 
 
 
API Recommended Practice 5LT 
Recommended Practice for Truck Transportation of Line Pipe 
 
 
API Recommended Practice 5LW 
Recommended Practice for Transportation of Line Pipe on Barges and Marine Vessels 
 
 
API Specification 6D 
Specification for Pipe Valves 
 
 
AP...
API 1169 Sample Test Questions And Answers.
API 1169 Sample Test Questions And Answers. 
Which of the following equipment may NOT be required for a pressure test? 
Internal line up clamps 
 
 
Before testing begins, a _____________ with explanatory notes and data should be prepared. 
Pressure test procedure 
 
 
The pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelines should be performed in accordance with: 
ASME, Code of Federal Regulations and any other applicable governmental regulations. 
...
- Exam (elaborations)
- • 5 pages •
API 1169 Sample Test Questions And Answers. 
Which of the following equipment may NOT be required for a pressure test? 
Internal line up clamps 
 
 
Before testing begins, a _____________ with explanatory notes and data should be prepared. 
Pressure test procedure 
 
 
The pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelines should be performed in accordance with: 
ASME, Code of Federal Regulations and any other applicable governmental regulations. 
...
API 1169 Exam |Latest Update Graded A+
API 1169 Exam |Latest Update Graded A+ 
FERC 
Federal Energy Regulatory Commission 
 
 
OSHA 
Occupational Safety and Hazard Administration 
 
 
PHMSA 
Pipeline Hazardous Materials and Safety Administration 
 
 
INGAA 
Interstate Natural Gas Association of America 
 
 
CFR 
Code of Federal Regulations 
 
 
EPA 
Environmental Protection Act 
 
 
CERCLA 
Comprehensive Environmental Response, Compensation and Liability Act also known as Superfund 
 
 
CERCLA purpose 
To remedy threats to human hea...
- Exam (elaborations)
- • 6 pages •
API 1169 Exam |Latest Update Graded A+ 
FERC 
Federal Energy Regulatory Commission 
 
 
OSHA 
Occupational Safety and Hazard Administration 
 
 
PHMSA 
Pipeline Hazardous Materials and Safety Administration 
 
 
INGAA 
Interstate Natural Gas Association of America 
 
 
CFR 
Code of Federal Regulations 
 
 
EPA 
Environmental Protection Act 
 
 
CERCLA 
Comprehensive Environmental Response, Compensation and Liability Act also known as Superfund 
 
 
CERCLA purpose 
To remedy threats to human hea...
NGA 31 & 40 - Installing PE/Steel Pipes (31A), Installing Pipe in an excavation (31B) Horizontal Boring (31D), Dead Insertion (31E), Replacing Tracer Wire (40) *BASIC 8 OQs* Original Set [Notes based on the NGA 31/40 Student Manual written by Industrial T
NGA 31 & 40 - Installing PE/Steel Pipes (31A), Installing Pipe in an excavation (31B) Horizontal Boring (31D), Dead Insertion (31E), Replacing Tracer Wire (40) *BASIC 8 OQs* Original Set 
[Notes based on the NGA 31/40 Student Manual written by Industrial Training Services] 
Backfill 
Refilling an excavated area or trench with excavated material. Proper backfill material depends on soil conditions and piping use. 
 
 
Bore Hole 
A hole bored into the ground vertically or horizontally to form a na...
- Exam (elaborations)
- • 6 pages •
NGA 31 & 40 - Installing PE/Steel Pipes (31A), Installing Pipe in an excavation (31B) Horizontal Boring (31D), Dead Insertion (31E), Replacing Tracer Wire (40) *BASIC 8 OQs* Original Set 
[Notes based on the NGA 31/40 Student Manual written by Industrial Training Services] 
Backfill 
Refilling an excavated area or trench with excavated material. Proper backfill material depends on soil conditions and piping use. 
 
 
Bore Hole 
A hole bored into the ground vertically or horizontally to form a na...
API 1169 (Pipeline Construction Inspector) Exam
API 1169 (Pipeline Construction Inspector) Exam 
Building ROW & Installing Pipeline 
Survey, Clearing & Grading, Stockpiling & Stringing 
Field Bending, Ditching & Excavation, Welding, Coating, 
Lowering-in, Backfilling, Cathodic Protection, 
HydrostaticTesting, Clean-up & Restoration 
 
 
On site Safety typically include: 
H2S, working alone policy, fall protection, restricted work area, confined space, hearing protection, manual lifting, lockout tagout, equipment inspection / vehicle, drug and...
- Exam (elaborations)
- • 2 pages •
API 1169 (Pipeline Construction Inspector) Exam 
Building ROW & Installing Pipeline 
Survey, Clearing & Grading, Stockpiling & Stringing 
Field Bending, Ditching & Excavation, Welding, Coating, 
Lowering-in, Backfilling, Cathodic Protection, 
HydrostaticTesting, Clean-up & Restoration 
 
 
On site Safety typically include: 
H2S, working alone policy, fall protection, restricted work area, confined space, hearing protection, manual lifting, lockout tagout, equipment inspection / vehicle, drug and...
API 1169. Study test questions test RM#2
API 1169. Study test questions test RM#2 
According to OSHA a "protective system" is defined as: 
Method of protecting employees from cave-ins. 
 
 
Design and development inputs shall be identified and reviewed for? 
Accuracy, completeness and lack of conflict 
 
 
The Excavator calls the One Call Center prior to excavation at least 
Two working days nor more than ten working days 
 
 
Encroachment Area is the area where the ground disturbance occurs within: 
50 feet of the centerline of th...
- Exam (elaborations)
- • 8 pages •
API 1169. Study test questions test RM#2 
According to OSHA a "protective system" is defined as: 
Method of protecting employees from cave-ins. 
 
 
Design and development inputs shall be identified and reviewed for? 
Accuracy, completeness and lack of conflict 
 
 
The Excavator calls the One Call Center prior to excavation at least 
Two working days nor more than ten working days 
 
 
Encroachment Area is the area where the ground disturbance occurs within: 
50 feet of the centerline of th...
API 1169 (Inspector Training) Questions And Answers..
API 1169 (Inspector Training) Questions And Answers.. 
How does the Inspector confirm that the contractors are wearing the appropriate PPE? 
If PPE is in accordance with the JSA. 
 
 
Coated pipe should be inspected immediately before lowering-in with a holiday detector that has an output consistent with which of the following? 
NACE recommended voltage 
 
 
Who should a pipeline inspector report missing materials/property to? 
Chief Inspector, project manager, or designated owner/operator perso...
- Exam (elaborations)
- • 10 pages •
API 1169 (Inspector Training) Questions And Answers.. 
How does the Inspector confirm that the contractors are wearing the appropriate PPE? 
If PPE is in accordance with the JSA. 
 
 
Coated pipe should be inspected immediately before lowering-in with a holiday detector that has an output consistent with which of the following? 
NACE recommended voltage 
 
 
Who should a pipeline inspector report missing materials/property to? 
Chief Inspector, project manager, or designated owner/operator perso...
API 1169 Recommended Practice Exam Verified 100% Correct!!
API 1169 Recommended Practice Exam Verified 100% Correct!! 
API Specification 5L 
Specification for line pipe 
 
 
APL Recommended Practice 5L1 
Recommended practice for railroad transportation of line pipe 
 
 
API Recommended Practice 5LT 
Recommended practice for truck transportation of line pipe 
 
 
API Recommended Practice 5LW 
Recommended practice for transportation of line pipe on barges and marine vessel 
 
 
API Specification 6D 
Specification for pipeline valves 
 
 
API Recommended P...
- Exam (elaborations)
- • 6 pages •
API 1169 Recommended Practice Exam Verified 100% Correct!! 
API Specification 5L 
Specification for line pipe 
 
 
APL Recommended Practice 5L1 
Recommended practice for railroad transportation of line pipe 
 
 
API Recommended Practice 5LT 
Recommended practice for truck transportation of line pipe 
 
 
API Recommended Practice 5LW 
Recommended practice for transportation of line pipe on barges and marine vessel 
 
 
API Specification 6D 
Specification for pipeline valves 
 
 
API Recommended P...
API 1169 Exam (2023)|Latest Update Graded A+
API 1169 Exam (2023)|Latest Update Graded A+ 
Definition for Active Excavation Area 
Is the area where the edge of the disturbance is within 25 feet of the centreline of the existing facilities. 
 
 
Definition for Crossing agreement 
Is the agreement entered into between the owner of the existing facility and the crossing company installing the new facility to specify the rights and obligations of the parties during the crossing Construciton. 
 
 
Define Crossing clearance distance 
Is the vert...
- Exam (elaborations)
- • 13 pages •
API 1169 Exam (2023)|Latest Update Graded A+ 
Definition for Active Excavation Area 
Is the area where the edge of the disturbance is within 25 feet of the centreline of the existing facilities. 
 
 
Definition for Crossing agreement 
Is the agreement entered into between the owner of the existing facility and the crossing company installing the new facility to specify the rights and obligations of the parties during the crossing Construciton. 
 
 
Define Crossing clearance distance 
Is the vert...
API 1169. study test questions test RM#1
API 1169. study test questions test RM#1 
According to FERC, environmental Inspectors shall have _____________ status in regards to all other craft inspectors. 
Equal 
 
 
According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches must be marked with the specification, the SMYS/Grade, and pipe size. 
4.5 
 
 
This legislation covers hazardous substance, site contamination, and cleanup 
Comprehensive environmental recovery, compensation, and liability act. 
 
 
A ...
- Exam (elaborations)
- • 13 pages •
API 1169. study test questions test RM#1 
According to FERC, environmental Inspectors shall have _____________ status in regards to all other craft inspectors. 
Equal 
 
 
According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches must be marked with the specification, the SMYS/Grade, and pipe size. 
4.5 
 
 
This legislation covers hazardous substance, site contamination, and cleanup 
Comprehensive environmental recovery, compensation, and liability act. 
 
 
A ...
American Board of Surgical Assistants TEST REVIEW |Completed with A+ Graded Answers
RNSG 1215 Exam 4, Questions and Correct Answers, With Complete Solution 2024.
Maryland Home Improvement Test (Answered) With Complete Verified Solution 100%
GEB 3213 Exam 2 – Trammell Questions With 100% Correct Answers.
Becc Test 5 Questions and Correct Answers, Complete Verified Solution, 2024.